Manage Building Schedules

 

Edit Event

To change the schedule:

  1. Click on the bar inside the time chart.
  2. In the pop up window, edit the event's details.
  3. To apply the changes to the building's normal schedule, check Make a permanent change. Do not check this box to edit only this day's schedule of events.
  4. Click Save.

 

Add Event

To add an event to the building schedule:

  1. Click on the bar inside the time chart.
  2. Click the Add Event link.
  3. Edit the event's details.
  4. To add the event to the building's normal schedule, check Make a permanent change. Do not check this box to add this event to only this day's schedule of events.
  5. Click Save.

 

Related topics